Deprecated: Required parameter $sftp follows optional parameter $storage_path in /home3/ssebra56/public_html/wp-content/plugins/duplicator-pro/lib/phpseclib/class.phpseclib.php on line 107
{"id":1329,"date":"2020-08-06T10:32:36","date_gmt":"2020-08-06T13:32:36","guid":{"rendered":"https:\/\/ssebrasil.com.br\/?page_id=1329"},"modified":"2020-08-07T10:42:17","modified_gmt":"2020-08-07T13:42:17","slug":"solucao-liquefacao-de-gas-pequena-escala","status":"publish","type":"page","link":"http:\/\/ssebrasil.com.br\/en\/small-scale-gas-liquefaction-solution\/","title":{"rendered":"Liquefa\u00e7\u00e3o de G\u00e1s – Pequena Escala"},"content":{"rendered":"
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Gas Liquefaction Solutions<\/h1>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Simulated and custom-designed configurations <\/h2>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

small scale - scalable capabilities<\/a><\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

SSE developed a solution for a small scale liquefaction plant with a nominal LNG production capacity of 15tpd scalable from 10tpd to 30tpd. <\/p>

The plant configuration was simulated and designed for SSLNG applications that receive gas from the pipeline. The liquefaction of bio-methane is also possible after updating the biogas.

The SSE solution results in an installation based on minimal equipment, with efficient solution, intelligent and rational simplification of auxiliary systems, reduced plant presence and minimum CAPEX ( CAPital EXpenditure <\/i> <\/b>) and OPEX ( OPerational EXpenditure <\/i> <\/b>) with remote operation and supervision capability.<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t